ICONIX GROUP
Free quotation
Contemporary kitchen prepared for cabinetry and everyday use

Kraków / kitchens

Kitchen renovation in Kraków

A kitchen works well when services, cabinetry and everyday routines have been considered before finishing work begins.

Request an estimate

ICONIX GROUP / Kraków

A kitchen works well when services, cabinetry and everyday routines have been considered before finishing work begins.

A kitchen renovation brings together cabinetry layout, appliances, lighting and work surfaces. ICONIX GROUP begins by mapping those relationships, so technical points, walls and floors are made in the right sequence.

01 / Scope of work

Layout first, then service points

01

review of existing connections and layout potential

02

preparation of electrical, plumbing and lighting work

03

wall and floor levelling for cabinetry and finishes

04

surface, tile, floor and cabinetry-junction finishing

02 / How we lead the project

Kitchens in Kraków

We renovate kitchens in Kraków and across Małopolska. After the site survey, we establish what can be changed in the property and what needs early coordination with the cabinetry designer.

01

conversation about kitchen function, appliances and cabinetry

02

plan of technical points and materials needing early decisions

03

preparatory work before cabinetry installation

04

checks on dimensions, clearances and finished surfaces

Contemporary kitchen prepared for cabinetry and everyday use

03 / What matters here

Layout first, then service points

An electrical point, drainage connection or finish height depends on specific appliances and cabinetry. We therefore do not begin with arbitrary service moves; first we resolve the layout, then translate it into delivery.

04 / Frequently asked questions

Do I need a cabinetry design before renovating a kitchen?

It is helpful to have at least an agreed cabinetry and appliance layout. This enables correct preparation of services, lighting and finish heights.

Can a sink or hob be moved?

That depends on existing connections, routes and technical conditions. We assess the potential at the property survey.

When are kitchen floors and tiles installed?

The sequence depends on the cabinetry design and selected materials. We agree it so junctions at furniture and appliances are properly resolved.

ICONIX GROUP / Kraków

Set the kitchen up from the right place

Share the cabinetry plan or describe how you want to use the kitchen. We will begin with the technical essentials.

CalculatorFree quotation